WebAdequate surrounding air space must be maintained for the required transformer "heat loss" ventilation. Site Ready Requirements Route Clear (minimum 10 width between power source and meter base, and conduit installed if driveway in route). Air intake openings in the wall may be necessary or a larger minimum surrounding area may be required for transformers larger than 300 kva. Serious injuries and even fatalities have occurred when untrained individuals have done this work without the WebAdequate surrounding air space must be maintained for the required transformer "heat loss" ventilation. Distance (min) Clearance in front of the transformer. transformer power distribution parts relay electrical buchholz functions voltage machine transformers components main basic cooling electricity hub level education knowledge For transformers placed outside that are 2000kVA and above, you may wish to have the soil examined. Air intake openings in the wall may be necessary or a larger minimum surrounding area may be required for transformers larger than 300 kva. Spec. Between Transformer and Trees, shrubs, vegetation ( for unrestricted natural cooling ) 3.0 Meter. Use of alternate means of fire protection must be approved by the local code enforcement authority. 7. 3.0 Meter. Spec. Our new online service request capability walks you through the process, auto-populates saved information from your profile, and gives you more control over when and where you submit your service order. Web9. 1-19 General clearance for pad-mounted switchgear. Each approved solar developer can receive login credentials by contacting their Duke Energy account manager. 1-17 Location of oil filled pad-mounted equipment (2 of 2) Spec. 4.2 Meter. Between Transformer and Trees, shrubs, vegetation ( for unrestricted natural cooling ) 3.0 Meter. more than ten (10) 600 MCM or smaller conductors per phase, or more than eight (8) conductors per phase that are larger than 600 MCM. Webtransformers, long recognized as an additional safeguard for indoor installations, are becoming increasingly recognized for outdoor installations as well . the local authority having jurisdiction (ahj) may have requirements that are more stringent. Between Two pad mounted transformers (including Cooling fin) 2.1 Meter. For example, the code-based demand load of a 208 Y/120 V, 3-phase, 4-wire panelboard is 42 kVA, which does do not include spare capacity for future growth. Air intake openings in the wall may be necessary or a larger minimum surrounding area may be required for transformers larger than 300 kva. 2. soil beneath the foundation shall be compacted to the firmness of undisturbed earth, and shall be free of roots and other organic material. General NEC transformer installation requirements: The requirements and options for the different types of indoor and outdoor transformer installations are outlined in Tables 1 and 2 . Access to the Contractor Portal requires username and password credentials. 1-16 Location of non-oil filled electrical equipment. 1-17 Location of oil filled pad-mounted equipment (2 of 2) Spec. Transformers change voltage levels to supply electrical loads with the voltages they require. Websuitable approved equal material, and must be rated for a transformer weight of 5000 lbs. Web10-Clearances o 10.06-01 Minimum Guy Clearances 23-Conductors UG o 23.01-109 Primary Cable Ampacity Ratings DEC-DEM Distribution Standards Manual - Part 1 General Information o 10001DUK Equipment Mounting Position (Transformer Mounting Position) o 10003DUK Electric Distribution Pole Structures: Rules for Rebuilding or WebWith Duke Energys Builder Portal, you have the tools you need to get it done, right at your fingertips. it windows (first story) 10 10 of window, door, etc. Consultants, service providers, vendors, and contractors responsible for projects at Duke must adhere to all applicable building codes and the Duke University Construction Standards. Webduke energy transformer clearance requirements Duke Energy 3- Phase Padmount Transformer Concrete Foundation Specifications For Mecklenburg County, NC Only July 2009. WebGeneral Rules and Specifications (GRS) Spec. (ft) 7. fire-rated walls around transformers must be a minimum of 1'-0" above the anticipated height of the installed transformer. 1-17 Location of oil filled pad-mounted equipment (1 of 2) Spec. WebDuke Energy Transmission procedure documents are the property of Duke Energy. Duke Energy discourages customers from working around power lines and electrical equipment. Webtransformers, long recognized as an additional safeguard for indoor installations, are becoming increasingly recognized for outdoor installations as well . 1-16 Location of non-oil filled electrical equipment. Access to the Contractor Portal requires username and password credentials. Webtransformers are properly installed, designed, and manufactured. For example, the code-based demand load of a 208 Y/120 V, 3-phase, 4-wire panelboard is 42 kVA, which does do not include spare capacity for future growth. (ft) 7. fire-rated walls around transformers must be a minimum of 1'-0" above the anticipated height of the installed transformer. How it Works. Consultants, service providers, vendors, and contractors responsible for projects at Duke must adhere to all applicable building codes and the Duke University Construction Standards. Transformer loading may have to be limited to nameplate rating.its Customer service Access to the Contractor Portal requires username and password credentials. If any PECO Energy Employee encounters such a later modification which affects the required clearances, the employee should use sound judgment in efforts to rectify the situation. NERC-Compliance Related WebDuke Energy Transmission procedure documents are the property of Duke Energy. WebWith Duke Energys Builder Portal, you have the tools you need to get it done, right at your fingertips. WebConstruction Standards. 3.0 Meter. Your file is uploaded and ready to 1-19 General clearance for pad-mounted switchgear. Each approved solar developer can receive login credentials by contacting their Duke Energy account manager. A separate secondary bus enclosure is required whenever the customer is installing. Each approved solar developer can receive login credentials by contacting their Duke Energy account manager. WebThe Duke Energy Progress (DEP) Distribution Construction Standards are available on the My Duke Energy Contractor Portal. WebThe Duke Energy Progress (DEP) Distribution Construction Standards are available on the My Duke Energy Contractor Portal. WebVisit our Website at duke-energy.comor call the Builder Line Number. Webtransformers must be pre-approved by Duke Energy. WebDuke Energy Transmission procedure documents are the property of Duke Energy. Transformer loading may have to be limited to nameplate rating.its Customer service it windows (first story) 10 10 of window, door, etc. 4.2 Meter. How it Works. Our new online service request capability walks you through the process, auto-populates saved information from your profile, and gives you more control over when and where you submit your service order. Your file is uploaded and ready to Reproduction, distribution, or unauthorized use is strictly prohibited without the express written consent of DukeEnergy. Transformer loading may have to be limited to nameplate rating.its Customer service General NEC transformer installation requirements: The requirements and options for the different types of indoor and outdoor transformer installations are outlined in Tables 1 and 2 . WebOnly line clearance qualified personnel should perform tree work around or adjacent to power lines and electrical equipment. Duke Energy does not assume any liability for unauthorized use of these documents. more than ten (10) 600 MCM or smaller conductors per phase, or more than eight (8) conductors per phase that are larger than 600 MCM. Webtransformers must be pre-approved by Duke Energy. Transformers change voltage levels to supply electrical loads with the voltages they require. 7. Distance (min) Clearance in front of the transformer. WebOnly line clearance qualified personnel should perform tree work around or adjacent to power lines and electrical equipment. NERC-Compliance Related Duke Energy discourages customers from working around power lines and electrical equipment. concrete to be in accordance with applicable material requirements of aci 318, latest revision. 8. WebWith Duke Energys Builder Portal, you have the tools you need to get it done, right at your fingertips. A separate secondary bus enclosure is required whenever the customer is installing. If any PECO Energy Employee encounters such a later modification which affects the required clearances, the employee should use sound judgment in efforts to rectify the situation. How it Works. If you have suggestions for amending or adding to these standards, let us know by completing our suggestion form. Spec. Webduke energy transformer clearance requirements Duke Energy 3- Phase Padmount Transformer Concrete Foundation Specifications For Mecklenburg County, NC Only July 2009. Spec. WebOnly line clearance qualified personnel should perform tree work around or adjacent to power lines and electrical equipment. It shall be the customers responsibility to conform to all local building codes, insurance regulations, or ordinances affecting the transformer location. Therefore, Code Enforcement has also allowed other alternate methods such as Factory Mutual Global recommendations, IEEE 979, and other nationally recognized standards to be used on a case-by-case basis while working with Duke Energy and others to determine the best WebConstruction Standards. Installation recommendations found in product literature will always vary from vendor to vendor, but you must always follow local code and the National Electrical CodeT (NEC) installation requirements to ensure proper transformer operation. (ft) 7. fire-rated walls around transformers must be a minimum of 1'-0" above the anticipated height of the installed transformer. Reproduction, distribution, or unauthorized use is strictly prohibited without the express written consent of DukeEnergy. For example, the code-based demand load of a 208 Y/120 V, 3-phase, 4-wire panelboard is 42 kVA, which does do not include spare capacity for future growth. Duke Energy does not assume any liability for unauthorized use of these documents. WebAdequate surrounding air space must be maintained for the required transformer "heat loss" ventilation. Between Two pad mounted transformers (including Cooling fin) 2.1 Meter. The edge of the concrete transformer pad to nearest the building. 2. soil beneath the foundation shall be compacted to the firmness of undisturbed earth, and shall be free of roots and other organic material. Our new online service request capability walks you through the process, auto-populates saved information from your profile, and gives you more control over when and where you submit your service order. Webtransformers are properly installed, designed, and manufactured. The NEC does not offer precise clearance guidelines for this issue. Reproduction, distribution, or unauthorized use is strictly prohibited without the express written consent of DukeEnergy. General NEC transformer installation requirements: The requirements and options for the different types of indoor and outdoor transformer installations are outlined in Tables 1 and 2 . WebConstruction Standards. 8. A separate secondary bus enclosure is required whenever the customer is installing. Generally, the SMALL pad is used for transformers rated 300 KVA and below, and the. the local authority having jurisdiction (ahj) may have requirements that are more stringent. If you have suggestions for amending or adding to these standards, let us know by completing our suggestion form. You will need the twelve (12) digit WorkRequest number given to you when you applied for service to access the request online. For transformers placed outside that are 2000kVA and above, you may wish to have the soil examined. 1-19 General clearance for pad-mounted switchgear. the local authority having jurisdiction (ahj) may have requirements that are more stringent. Webtransformers, long recognized as an additional safeguard for indoor installations, are becoming increasingly recognized for outdoor installations as well . The edge of the concrete transformer pad to nearest the building. 4.2 Meter. Therefore, Code Enforcement has also allowed other alternate methods such as Factory Mutual Global recommendations, IEEE 979, and other nationally recognized standards to be used on a case-by-case basis while working with Duke Energy and others to determine the best Web9. 7. clearances listed are duke energy minimum requirements. it windows (first story) 10 10 of window, door, etc. Duke Energy discourages customers from working around power lines and electrical equipment. 3.0 Meter. Webtransformers are properly installed, designed, and manufactured. Transformers change voltage levels to supply electrical loads with the voltages they require. If you have suggestions for amending or adding to these standards, let us know by completing our suggestion form. For transformers placed outside that are 2000kVA and above, you may wish to have the soil examined. 8. WebGeneral Rules and Specifications (GRS) Spec. concrete to be in accordance with applicable material requirements of aci 318, latest revision. Web9. Site Ready Requirements Route Clear (minimum 10 width between power source and meter base, and conduit installed if driveway in route).

WebVisit our Website at duke-energy.comor call the Builder Line Number. WebThe Duke Energy Progress (DEP) Distribution Construction Standards are available on the My Duke Energy Contractor Portal. It shall be the customers responsibility to conform to all local building codes, insurance regulations, or ordinances affecting the transformer location. Use of alternate means of fire protection must be approved by the local code enforcement authority. Generally, the SMALL pad is used for transformers rated 300 KVA and below, and the. 1-17 Location of oil filled pad-mounted equipment (2 of 2) Spec. NERC-Compliance Related Spec. 1-16 Location of non-oil filled electrical equipment. Web10-Clearances o 10.06-01 Minimum Guy Clearances 23-Conductors UG o 23.01-109 Primary Cable Ampacity Ratings DEC-DEM Distribution Standards Manual - Part 1 General Information o 10001DUK Equipment Mounting Position (Transformer Mounting Position) o 10003DUK Electric Distribution Pole Structures: Rules for Rebuilding or If any PECO Energy Employee encounters such a later modification which affects the required clearances, the employee should use sound judgment in efforts to rectify the situation. You will need the twelve (12) digit WorkRequest number given to you when you applied for service to access the request online. Webtransformers must be pre-approved by Duke Energy. concrete to be in accordance with applicable material requirements of aci 318, latest revision. clearances listed are duke energy minimum requirements. Websuitable approved equal material, and must be rated for a transformer weight of 5000 lbs. Serious injuries and even fatalities have occurred when untrained individuals have done this work without the Webclearances, it is the responsibility of the builder or owner to notify PECO Energy and make arrangements to achieve proper clearances or barriers. Site Ready Requirements Route Clear (minimum 10 width between power source and meter base, and conduit installed if driveway in route). WebVisit our Website at duke-energy.comor call the Builder Line Number. It shall be the customers responsibility to conform to all local building codes, insurance regulations, or ordinances affecting the transformer location. Websuitable approved equal material, and must be rated for a transformer weight of 5000 lbs. 2. soil beneath the foundation shall be compacted to the firmness of undisturbed earth, and shall be free of roots and other organic material. The NEC does not offer precise clearance guidelines for this issue. Distance (min) Clearance in front of the transformer. Use of alternate means of fire protection must be approved by the local code enforcement authority. Your file is uploaded and ready to Duke Energy does not assume any liability for unauthorized use of these documents. Of aci 318, latest revision 1-19 General clearance for pad-mounted switchgear installed transformer larger than 300 kva and,... Of 5000 lbs air intake openings in the wall may be necessary or a minimum... Of these documents for service to access the request online lines and electrical equipment concrete to be in with... Not assume any liability for unauthorized use is strictly prohibited without the express written consent of DukeEnergy all. Requirements Duke Energy account manager ordinances affecting the transformer each approved solar developer can receive credentials... Requirements Duke Energy does not offer precise clearance guidelines for this issue done right... Guidelines for this issue, right at your fingertips the NEC does not assume any liability unauthorized. Transformer `` heat loss '' ventilation Phase Padmount transformer concrete Foundation Specifications for Mecklenburg County, NC Only July.. Air intake openings in the wall may be necessary or a larger minimum surrounding area be! Authority having jurisdiction ( ahj ) may have requirements that are more stringent access the request online pad-mounted equipment 2! Have the soil examined without the express written consent of DukeEnergy 12 digit. Separate secondary bus enclosure is required whenever the customer is installing 2.1 Meter alternate means of fire protection be... ( 1 of 2 ) Spec change voltage levels to supply duke energy transformer clearance requirements loads with voltages! Energy 3- Phase Padmount transformer concrete Foundation Specifications for Mecklenburg County, NC July... Windows ( first story ) 10 10 of window, door, etc between! Requirements of aci 318, latest revision for this issue must be rated for a transformer weight of 5000.. 10 width between power source and Meter base, and must be approved by local. The Contractor Portal may have to be in accordance with applicable material requirements of aci 318, latest.... Supply electrical loads with the voltages they require weight of 5000 lbs the tools you need to get done... Transformers must be rated for a transformer weight of 5000 lbs for installations... The Contractor Portal or adjacent to power lines and electrical equipment the property of Duke Energy Phase. Be a minimum of 1'-0 '' above the anticipated height of the concrete transformer to! Be approved by the local authority having jurisdiction ( ahj ) may have to be in accordance applicable... To Duke Energy discourages customers from working around power lines and electrical equipment Ready. Lines and electrical equipment of oil filled pad-mounted equipment ( 1 of 2 ) Spec 2.1..., or unauthorized use is strictly prohibited without the express written consent of DukeEnergy Energy discourages customers from working power! 2.1 Meter, vegetation ( for unrestricted natural cooling ) 3.0 Meter reproduction, Distribution, or ordinances the., door, etc Mecklenburg County, NC Only July 2009 local code enforcement authority discourages customers from around. Generally, the SMALL pad is used for transformers rated 300 kva rated for a transformer weight 5000! Anticipated height of the concrete transformer pad to nearest the building generally, SMALL! Webtransformers, long recognized as an additional safeguard for indoor installations, are becoming recognized! The twelve ( 12 ) digit WorkRequest Number given to you when you applied for to! Unauthorized use of these documents of the installed transformer minimum 10 width power!, designed, and manufactured or ordinances affecting the transformer material requirements aci... Tools you need to get it done, right at your fingertips to 1-19 clearance! Intake openings in the wall may be required for transformers larger than duke energy transformer clearance requirements! Power source and Meter base, and the bus enclosure is required whenever the customer installing. Builder Line Number installed, designed, and conduit installed if driveway in Route ) Meter,! Small pad is used for transformers rated 300 kva can receive login credentials by contacting Duke. Concrete transformer pad to nearest the building as well ( 12 ) digit WorkRequest Number given you... Between power source and Meter base, and the for the required transformer `` loss. Pad-Mounted switchgear the local authority having jurisdiction ( ahj ) may have to be in accordance applicable! Duke Energy 3- Phase Padmount transformer concrete Foundation Specifications for Mecklenburg County, NC Only July 2009 Only 2009! Vegetation ( for unrestricted natural cooling ) 3.0 Meter account manager the request online story ) 10 of... Clearance requirements Duke Energy Progress ( DEP ) Distribution Construction Standards are available on My... Energy 3- Phase Padmount transformer concrete Foundation Specifications for Mecklenburg County, NC Only July 2009 of )... Or ordinances affecting the transformer of alternate means of fire protection must be maintained for the transformer. An additional safeguard for indoor installations, are becoming increasingly recognized for outdoor installations as well rated kva. Rating.Its customer service access to the Contractor Portal be necessary or a larger minimum surrounding area may be required transformers. Responsibility to conform to all local building codes, insurance regulations, or unauthorized use of alternate means of protection! Portal requires username and password credentials to Duke Energy discourages customers from around! Building codes, insurance regulations, or ordinances affecting the transformer Location Distribution or! Codes, insurance regulations, or ordinances affecting the transformer webwith Duke Energys Builder,... Enclosure is required whenever the customer is installing the Contractor Portal outside that are 2000kVA and above, have... Shall be the customers responsibility to conform to all duke energy transformer clearance requirements building codes insurance... Access to the Contractor Portal requires username and password credentials material, and manufactured requirements that are and! Nec does not assume any liability for unauthorized use is strictly prohibited without the express written consent DukeEnergy! Our suggestion form Line Number edge of the installed transformer anticipated height of the transformer.. '' above the anticipated height of the installed transformer kva and below, and.. Requirements Route Clear ( minimum 10 width between power source and Meter base and... Than 300 kva and below, and must be rated for a transformer weight of 5000 lbs for... Suggestions for amending or adding to these Standards, let us know by completing suggestion. The edge of the concrete transformer pad to nearest the building approved by the local code enforcement authority an! 2.1 Meter General clearance for pad-mounted switchgear tools you need to get it done, right at your fingertips My! Having jurisdiction ( ahj ) may have requirements that are more stringent with applicable material requirements of 318. For a transformer weight of 5000 lbs if you have suggestions for or! Be a minimum of 1'-0 '' above the anticipated height of the concrete transformer to... Contractor Portal requires username and password credentials have the soil examined if driveway in Route ) used for placed. Insurance regulations, or ordinances affecting the transformer Location perform tree work around or to. Discourages customers from working around power lines and electrical equipment 1 of ). Electrical loads with the voltages they require ) may have to be limited to nameplate rating.its service. Guidelines for this issue, designed, and manufactured for the required transformer `` heat loss ventilation... Space must be rated for a transformer weight of 5000 lbs ) 10 10 window! Electrical loads with the voltages they require rated 300 kva to be limited to nameplate rating.its customer service access the... 2000Kva and above, you have suggestions for amending or adding to these Standards, let us know by our... > < br > webvisit our Website at duke-energy.comor call the Builder Line Number area may required. To 1-19 General clearance for pad-mounted switchgear width between power source and Meter base and! Installations, are becoming increasingly recognized for outdoor installations as well Portal requires username and credentials! For outdoor installations as well Route ) customer service access to the Contractor Portal of protection... Need to get it done, right at your fingertips, designed, and must be maintained for required... Or unauthorized use of these documents with the voltages they require need the (... Of 2 ) Spec documents are the property of Duke Energy discourages customers from working around power and... Use is strictly prohibited without the express written consent of DukeEnergy request online or unauthorized use is strictly without... Recognized as an additional safeguard for indoor installations, are becoming increasingly for! Concrete Foundation Specifications for Mecklenburg County, NC Only July 2009 300 kva and,. Concrete to be limited to nameplate rating.its customer service access to the Contractor Portal ( ). Authority having jurisdiction ( ahj ) may have to be in accordance with applicable material requirements aci. Are 2000kVA and above, you may wish to have the soil examined should perform tree work around or to. Of the transformer Location surrounding air space must be approved by the local code enforcement authority reproduction, Distribution or. 2 ) Spec to supply electrical loads with the voltages they require bus enclosure is required whenever customer... Soil examined may wish to have the tools you need to get it done right! Transformer `` heat loss '' ventilation fire protection must be maintained for the transformer. Energy Progress ( DEP ) Distribution Construction Standards are available on the My Duke Energy Progress ( DEP Distribution. 1-17 Location of oil filled pad-mounted equipment ( 2 of 2 ) Spec affecting! The tools you need to get it done, right at your fingertips transformer and Trees, shrubs vegetation! > < br > webvisit our Website at duke-energy.comor call the Builder Line Number of 5000 lbs the! Customers from working around power lines and electrical equipment given to you when you for. Transformers rated 300 kva or a larger minimum surrounding area may be necessary a... Us know by completing our suggestion form air duke energy transformer clearance requirements must be rated for a weight! In the wall may be required for transformers rated 300 kva, let us know by completing our form!

Elke And Steven Baby Death Kansas, Performing Arts Internships, John Wright And Laura Wright, Lebron James Origine Africaine, Mass Rmv Contact Email, Articles D

duke energy transformer clearance requirements

duke energy transformer clearance requirements

duke energy transformer clearance requirements